Question 1
Before slope work starts, which remote items must be verified?
Remote work starts with control verification.Question 2
Where should the remote operator avoid standing?
Question 3
You lose sight of the attachment for three seconds behind brush. Correct action?
Question 4
The slope has a wet seam and no safe recovery point. What should happen?
Question 5
Which event requires immediate emergency stop?
Question 6
A spotter on slope work should be:
Question 7
What decides the pace on remote slope mulching?
Question 8
After a minor slide and emergency stop, what comes next?
Question 9
The downhill runout points toward a driveway. What hazard zone must be controlled?
Question 10
Which statement best matches the field standard?
Required score: 90%0/10 answered